Important Notes

  • For details about technical specifications, see section “Technical Specifications” in Technical White Paper.
  • Currently, openGauss supports a maximum of eight standby nodes. The lite edition does not have CM management. If one primary node and multiple standby nodes are used and the primary node is faulty, promote a standby node with more logs to primary, preventing other standby nodes from being rebuilt.
  • You are advised to deploy one primary node and two standby nodes to ensure database reliability and availability.
Feedback
编组 3备份
    openGauss 2024-07-26 00:59:28
    cancel